最近免费中文字幕大全免费版视频|久久亚洲AV无码精品色午夜麻豆|2020国内精品久久久久精免费|狠狠狠色丁香婷婷综合久久五月婷|亚洲淫女一区二区三区資源免費看|亚洲国产婷婷综合在线18未满精品|欧美日韩亚洲综合一区二区三区激情在线

<center id="j497u"></center>
  • <s id="j497u"></s>
    1. <tt id="j497u"></tt>

      <kbd id="j497u"><xmp id="j497u">
    2. <kbd id="j497u"></kbd>

        <center id="j497u"></center>
        <th id="j497u"><label id="j497u"></label></th>
        <abbr id="j497u"></abbr>
      1. Hi! Welcome to Taian Tenglu Engineering Materials Co.,Ltd.!

        National Consulting Hotline:

        +86 18605386600

        (WeChat same number)

        Your location:Home>News Center

        How should the geomembrane be laid and what problems should be paid attention to in the construction process?

        Release time:2022/3/28
        This article is read:1180times

        How should the geomembrane be laid and what problems should be paid attention to in the construction process?

        How should the geomembrane be laid and what problems should be paid attention to in the construction process?


        1. Before laying geomembrane, the corresponding qualified acceptance certificate documents of civil engineering should be obtained.


        2. Before cutting the geomembrane, its relevant dimensions should be accurately measured, and then cut according to the actual size. Generally, it is not suitable to cut according to the size shown in the figure. It should be numbered one by one and recorded in detail on a special form.


        3. When laying geomembrane, we should strive for less welds, and try to save raw materials on the premise of ensuring quality. At the same time, it is easy to guarantee the quality.


        4. The lap width of the seam between the film and the film is generally not less than 10cm. Usually, the direction of the welding seam is parallel to the slope, that is, it is arranged along the slope direction.


        5. Usually in corners and deformed areas, the length of the seam should be shortened as much as possible. Except for special requirements, on slopes with a slope greater than 1:6, within 1.5 meters from the top slope or the stress concentration area, try not to set welds.


        6. During the laying of the geomembrane, artificial folds should be avoided. When the temperature is low, it should be tightened as much as possible and flattened.


        7. After the geomembrane is laid, walking on the membrane surface, moving tools, etc. should be minimized. Any objects that can cause harm to the anti-seepage membrane should not be placed on the membrane or carried on the membrane to avoid damage to the membrane. cause accidental damage.


        It is recommended to pay attention to the following aspects of this project:


        ①After the composite geomembrane is welded into a finished product, first make the lake bottom mortar protective layer.


        ②The bridge foundation is waterproof, adopts the steel bar through-membrane welding method, and uses a mortar protective layer to prevent the hidden quality risks caused by electric welding.


        ③The pasting of the composite geomembrane and the wall must prevent the appearance of large-scale hollowing.

        How should the geomembrane be laid and what problems should be paid attention to in the construction process?
        Previous:How to choose the application scope of 3D composite drainage networknext:How to choose the application scope of 3D composite drainage network
        Manufacturer of Geosynthetic and new building materials industry

        Service hotline:

        +86?18605386600

        Contact us:

        Contact: Anna Han

        Tel/Whatsapp: +86 18605386600

        Email: 18605386600@163.com

        Enterprise Tel: +86 0538-8999499

        1111

           Taian Tenglu Engineering Materials Co.,Ltd.         魯ICP備17054754號-1                      公示信息

        汨罗市| 新干县| 忻城县| 浠水县| 大渡口区| 双柏县| 黎平县| 镇坪县| 钟祥市| 东至县| 平塘县| 伊吾县| 开封市| 宜昌市| 湄潭县| 孙吴县| 阳高县| 鸡西市| 新绛县| 望谟县| 张家港市| 昂仁县| 南溪县| 晋中市| 吉隆县| 永新县| 宝山区| 武清区| 嘉义市| 沾化县| 娱乐| 宜兰县| 晴隆县| 延津县| 蒲江县| 屏山县| 淄博市| 卢龙县| 栾川县| 山东| 苏尼特右旗|